Caving: Swildons Hole (06-Oct-02)

Caving Logbook

Caving: Swildons Hole (06-Oct-02)

  • Swildons Hole

  • 03:00 hours
  • 1,127:45 cumulative hours

BEC AGM weekend. The Saturday was spent up at Split Rock, while on the Sunday we tried to cure our hangovers by doing the Short Round Trip in Swildon's. Everything went according to plan, the mud sump was incredibly dry, and route finding went without two many problems. At the Troubles, we set the siphons running but the water levels were low enough for us to be able to pass them anyway. Sump 1 and the general aquatic nature of the round trip did wonders in curing the hangover.

Strava Stats

Recent Last 4 weeks

3 nr
14 mi
02:04:14
826 ft
0 nr
0 mi
00:00:00
0 ft
1 nr
1 mi
00:44:39

Year-to-date

31 nr
113 mi
16:22:42
9,011 ft
2 nr
47 mi
03:29:01
2,184 ft
32 nr
40 mi
25:24:57

All-Time Stats

1,498 nr
10,346 mi
1432:03:58
809,530 ft
907 nr
5,916 mi
505:55:16
441,165 ft
85 nr
102 mi
69:44:12

Social