Caving: Ogof Fynnon Ddu (15-May-04)

Caving Logbook

Caving: Ogof Fynnon Ddu (15-May-04)

  • Ogof Ffynnon Ddu

  • 04:00 hours
  • 1,437:30 cumulative hours

Despite the inevitable navigational problem in OFD top we eventually made it down to the streamway and carried on to Top Waterfall. On the way out Bridget fell and hit her back in the great oxbow sump bypass in the main stream. Fortunately she was OK but it could have been a lot worse. We left the cave via Cwm Dwr.

Strava Stats

Recent Last 4 weeks

3 nr
14 mi
02:04:14
826 ft
0 nr
0 mi
00:00:00
0 ft
1 nr
1 mi
00:44:39

Year-to-date

31 nr
113 mi
16:22:42
9,011 ft
2 nr
47 mi
03:29:01
2,184 ft
32 nr
40 mi
25:24:57

All-Time Stats

1,498 nr
10,346 mi
1432:03:58
809,530 ft
907 nr
5,916 mi
505:55:16
441,165 ft
85 nr
102 mi
69:44:12

Social