Caving: DYO (01-Jul-01)

Caving Logbook

Caving: Dyo (01-Jul-01)

  • Martin Groves

  • Dan-Yr-Ogof

  • 05:00 hours
  • 707:45 cumulative hours

Digging trip in Surprise Chamber down by the Green Canal. Lots of boulders were pulled out and slight progress was made into about 6' of new passage but continuing operations here would have to be long term. A few other areas were looked at while in Surprise Chamber but nothing looked promising. On our return a possible aven by the abyss was noted for something to do on future trips.

Strava Stats

Recent Last 4 weeks

16 nr
92 mi
11:35:09
3,620 ft
1 nr
25 mi
03:03:23
920 ft
0 nr
0 mi
00:00:00

Year-to-date

161 nr
1,112 mi
140:53:56
46,810 ft
28 nr
309 mi
38:03:03
30,976 ft
0 nr
0 mi
00:00:00

All-Time Stats

1,390 nr
9,761 mi
1348:10:20
760,589 ft
880 nr
5,477 mi
467:37:27
412,617 ft
35 nr
44 mi
31:30:21

Social